POWERING THROUGH ADVERSITY

nexperia
nexperia

Cat® generators help company overcome power uncertainties

Customer: Nexperia

Location: Light Industry Science Park of the Philippines Philips Ave., Barrio, Cabuyao, Laguna

Customer Business Issue: Production stability after the Taal Volcano eruption and amidst COVID-19 pandemic conditions.

Solution: 

One Cat® C13 generator set for 320 kW standby applications, 380V with enclosure

One Cat C13 generator set for 350 kW standby applications, 240V with enclosure

Cat® Dealer: Monark Equipment Corporation

of

When Nexperia Philippines, Inc. requested an immediate delivery of its Cat® generators to protect the materials in its warehouse, Monark delivered the two units without any problems on March 25.

of

As a result of stricter quarantine measures, Monark’s engineering team could not be onsite to complete the testing and commissioning of Nexperia’s new generator sets.

of

After the Cat units were installed, the engineering team at Monark held a video conference with the facilities and energy team at Nexperia to walk them through the final stages.

of

“Even in the midst of the COVID-19 crisis, you were able to connect the Monark team, Jerwin and Chris, with my team physically and virtually to make sure generator installation, testing, and commissioning will be successful.”

Nexperia
Nexperia
Nexperia
Nexperia

POWER NEED

As a high-volume semiconductor company, Nexperia Philippines, Inc. proactively looked for generator sets to provide countermeasures for power uncertainties brought on by the eruption of the Taal Volcano on January 12, 2020.

On January 28, Nexperia finalized the deal with Cat dealer Monark Equipment Corporation and purchased two Cat generator sets. The first unit is the C13 320 kW at 380V, and the second unit is the C13 350 kW at 240V. These new gensets will be used for Nexperia’s CDP area and warehouse.

Another unfortunate adversity Nexperia has faced during 2020 is the COVID-19 pandemic. When the government imposed the enhanced community quarantine due to the outbreak, Nexperia Philippines requested Monark deliver the units immediately, worried that the materials in its warehouse could be damaged in the event of prolonged unscheduled power interruption. Fortunately, Monark Equipment Corp. managed to deliver the two Cat units without any problems on March 25, 2020.

After the delivery, Nexperia hired a third-party contractor to install the Cat C13 units and requested the help of Monark’s engineering team to do the commission work. Cris Bolivar, an engineer for Monark, ensured that everything was in place for Nexperia, including testing the unit, advising the customer on what needed to be done for testing, and assessing the readiness of the unit’s configuration for load testing. Bolivar made sure that everything would flow smoothly even when the Monark engineering team would not be onsite during the final stages of the installation and commissioning.

The installation was complete after the visit, but the quarantine measures had tightened, which prevented the Monark team from completing the commissioning work.

SOLUTION

Through the resiliency of Monark’s engineering team, the Cat dealer held a video conference with Nexperia’s facilities and energy team to provide a step-by-step completion of testing and commissioning for the generator sets.

RESULTS

With the efforts and expertise of Monark’s engineering team, Nexperia was able to test and load the generator set. When the unit was fully turned over and operational, Nexperia informed Monark of its plan to utilize the generator set for a temporary facility that would house its skeletal force.

Thereafter, an email commendation from Nexperia’s facility manager stated:

“Even in the midst of the COVID-19 crisis, you were able to connect the Monark team, Jerwin and Chris, with my team physically and virtually to make sure generator installation, testing, and commissioning will be successful.”

Download the Power Profile

Featured products

  • C13 (50 Hz)
    Maximum Rating
    450 kVA
    450 kVA
    Minimum Rating
    350 kVA
    350 kVA
    Emissions/Fuel Strategy
    Low Fuel, R96/EUIIIa
    Low Fuel, R96/EUIIIa

    C13 (50 Hz)

    The C13 diesel generator sets have been developed for your mission critical, standby and prime applications. Producing reliable power from 350 to 450 kVA at 50 Hz, our C13 diesel generator sets designed to ISO 8528-5 transient response requirements. These generator sets range from low fuel consumption systems EU Stage IIIA Non-road Emission Standards Emissions / Fuel Strategy.

    Learn More

Electric Power products

Any size or shape. In any regulatory environment. When you need power, Caterpillar is equal to the challenge. Our generators are used in a variety of applications.

View Electric Power products
Electric Power products
Electric Power products

Generator Set Sizing Calculator

Caterpillar Electric Power is excited to introduce you to our latest generator set sizing software, Cat® Electric Power SpecSizer.

Learn More
specsizer
specsizer

manufacturing

When your lines aren't moving, you're not making money. You need power that will keep you in production and keep you efficient. Cat® standby generator sets run with low owning and operating costs. We’re helping you maximize profit by minimizing electrical expenses.

View Manufacturing page
manufacturing
manufacturing

CAT® DEALERS MAKE THE DIFFERENCE

Your Cat dealer is committed to maximizing your success, helping you get the most out of your operations with site-level solutions, service and support.

CONNECT WITH YOUR DEALER TODAY
dealers
dealers