As one of Turkey’s largest build-operate-transfer highway projects, the construction of the Gebze-İzmir motorway is expected to boost the Turkish economy and environment by significantly reducing travel times between various cities.
NÖMAYG A.O, the main construction contractor, required reliable power to produce the approximately 8.6 million tons of asphalt for the project. It also needed spare power for the Osmangazi suspension bridge, which crosses the İzmit Bay, as well as enough energy to power and light road junctions, tunnels, service and parking places, security, maintenance complexes, intelligent traffic systems, and toll collection systems.
Leveraging its excellent relationship with local Cat® dealer Borusan Cat, NÖMAYG A.O acquired 53 Cat generator sets over the course of the project. When it came to selecting a partner to contract with, Borusan’s expertise, the technical superiority of Cat generator sets, and the extensive Caterpillar service network gave the dealer a competitive advantage.
The nature of the project meant every decision was critical. Borusan closely monitored the entire process, with technicians on-site to provide technical support and routine maintenance to minimize delays.
“The responsiveness for all technical support and servicing throughout the construction phases and since completion has proved to us that we made a really good decision by choosing Cat generator sets,” says Ahmet Ehran Titrek from NÖMAYG A.O.